Gongyi Hengchang Metallurgical Building Material Equipments Plant
Products
Contact Us
  • Contact Person : Mr. Qi Fergus
  • Company Name : Gongyi Hengchang Metallurgical Building Material Equipments Plant
  • Tel : 86-371-86106152
  • Fax : 86-371-86106561
  • Address : Henan,Zhengzhou,Jianshe Road
  • Country/Region : China
  • Zip : 450000

Alluvial Gold Refining Plant/Placer Gold Washing Plant With The 85-90% Golld Recovery Rate

Alluvial Gold Refining Plant/Placer Gold Washing Plant With The 85-90% Golld Recovery Rate
Product Detailed
Related Categories:Mineral Separator
Alluvial Gold refinng Plant 1. 20 years experience 2. Easy installation 3. ISO9001:2008 4. Great with placer gold

Alluvial Gold Refining Plant / Placer gold washing plantIn Pratical Placer gold ore refining process, the gravity separating process has been proved to be the most efficient and economic way. because of the size of the placer gold ore, so there are several machines will be used in this process. coarse separating machines, fine separating machines and the sweep separating machines.

Alluvial Gold refining Plant / Placer gold washing plant three steps

Firstly, using the spiral chute machine for the coarse separating the recovery rate of this process can reach 70-74% and then use the jig machne and the shaking table for sweeping separating and the fie separating. After all these three process the recovery rate can reach the high point of 85-90%.

Technical parameter of the Spiral chute, jig machine and the 6-s shaking table

 Foreign customers In our factory

If you have anything problem about the machines please feel free o contact me.

Alluvial Gold Refining Plant/Placer Gold Washing Plant With The 85-90% Golld Recovery Rate



Copyright Notice @ 2008-2022 ECBAY Limited and/or its subsidiaries and licensors. All rights reserved.